As part of our pre-application consultation we held two public exhibitions in the local area in June 2026, to share more information about the project and to enable people to provide us with their feedback.

The exhibitions initiated a consultation period being run by RES to gather comments on the proposal. The closing date for comments was 31 July 2026 at 5pm. Comments may still be made on the proposal but may not be considered in relation to the design development. Please contact us for more information.

Any feedback received will be taken into consideration, along with the results of site surveys and assessments, as we finalised the design.

All information provided at the public exhibitions in June 2026, is available to view below.

Click on each image to enlarge

Welcome to our public exhibition

The need for onshore wind

Repowering onshore wind

Project overview

Design layout and infrastructure

Constraints and considerations

Zone of theoretical visibility (ZTV)

Provisional viewpoint 10

Provisional viewpoint 24

Provisional viewpoint 26

Provisional viewpoint 31

Provisional viewpoint 54

Environmental considerations

Maximising local benefit

Decommissioning and repurposing

Commenting on the proposal

All information provided at the public exhibitions was available on this website for a minimum of 28 days.  

Please note that comments submitted to RES at this time were not representations to the determining authority (Strategic Planning Directorate Department for Infrastructure). There will be an opportunity to submit representations to the determining authority should an application be made.